2003.08 english park
football stadium including changing, offices and lounge
crispin schurr design architect at ccc
programme
demolition of existing outdoor banked velodrome
formation of football match field
internal lounge with bar
cafe and ablutions
changing areas, offices and gym
storage
2.8ha park development
issues
poor pitch drainage
st albans creek is piped
entire site is concealed within solid sheet metal fencing
no through site linkage
10,000m3 of fill requires removal from the old velodrome
intermittently occupied facilities prone to vandalism
universal access required
limited budget
solutions
new sculptural hill created to prevent need to remove fill from site
building ground floor buried one side in ground to remove solid facade prone to vandalism
hill attached to building on either side as embankments for overfloor seating
building oriented for protection from predominant wind
building located close to pitch to intensify atmosphere for small crowds
lounge glazing vertically sliding to open completely during games
northwest facing glazing used for passive solar heat games
ramped access to public areas removes need for lift
creek is daylit and naturalised
through site connection created along school boundary
transparent quality metal rod fencing used to enclose pitch
multi-use carpark with school access / play space and swale water treatment
high quality pitch construction and drainage
status
completed
awards
civic trust award
nzia local architecture award