2006.01 north new brighton memorial hall
earthquake strengthening, entry extension, refurbishment of community hall
crispin schurr design architect at ccc
programme
earthquake strengthen character hall building
provide universal access to all spaces in building
create external deck area to complement hall
upgrade ablutions and kitchen
undertake re-roofing and deferred maintenance
issues
marine environment within sea spray zone
spalling of concrete structure
etching of glazing, corrosion of metals
no ground floor slab
low seismic resistance
poor insulation
solutions
new ground floor slab
robust resilient concrete new structure
new lateral bracing appropriate to location (shear walls / k-braces)
breaking out and repair of spalling existing concrete
new purlins create cavity for new roof insulation
strapping and lining of exterior walls incorporating insulation & acoustic slot absorption
new energy efficient services
new lift access
refurbished ablutions and kitchen
new deck connecting first floor hall space to beach
covered entry space
refurbished windows
new fire egress increases hall capacity
status
completed