2001.01 film 4 international

office building with preview cinema and client entertainment

crispin schurr project architect at russell knowles associates

programme

  • five floors of primarily open plan offices

  • individual offices, meeting areas, tea nooks and storage areas

  • entry / reception waiting and clubroom

  • preview cinema / projection room

  • existing building completely stripped back to bare structure

  • fast track build

  • detailed design to be undertaken concurrently with build

  • consenting to be undertaken concurrently with build

issues

  • existing flats to remain occupied during build

  • preview cinema to be located beneath existing flats

  • multipurpose ground floor occupancy as both reception and entertainment zone

  • fixed occupation date

  • basement access to light

  • low inter storey height

  • deep floor plate

  • limited services routing

  • complex passive fire protection and egress routes

solutions

  • preview cinema base isolated from rest of building and located in acoustic container

  • stressed skin cladding for cost effective structural performance

  • structural steel facade fenestration frames windows and defines rhythm of facade

  • north face natural lighting to open plan work spaces

  • fully glazed offices / meeting rooms along west wall allow light transmission to spaces beyond

  • roller blinds to west windows prevent late afternoon over heating / glare

  • joinery formed beneath sill along west wall allow localised hvac distribution and control

  • translucent ramp / steps to entry to allow light passage to basement

  • bar / cafe integrated into reception

  • perimeter bulkheads for services distribution / delivery

  • offices have exposed concrete soffits to maximise volume

  • uplighting of soffits with flood lights on arms from central beam for services access / diffuse lighting

status

  • completed