2001.01 film 4 international
office building with preview cinema and client entertainment
crispin schurr project architect at russell knowles associates
programme
five floors of primarily open plan offices
individual offices, meeting areas, tea nooks and storage areas
entry / reception waiting and clubroom
preview cinema / projection room
existing building completely stripped back to bare structure
fast track build
detailed design to be undertaken concurrently with build
consenting to be undertaken concurrently with build
issues
existing flats to remain occupied during build
preview cinema to be located beneath existing flats
multipurpose ground floor occupancy as both reception and entertainment zone
fixed occupation date
basement access to light
low inter storey height
deep floor plate
limited services routing
complex passive fire protection and egress routes
solutions
preview cinema base isolated from rest of building and located in acoustic container
stressed skin cladding for cost effective structural performance
structural steel facade fenestration frames windows and defines rhythm of facade
north face natural lighting to open plan work spaces
fully glazed offices / meeting rooms along west wall allow light transmission to spaces beyond
roller blinds to west windows prevent late afternoon over heating / glare
joinery formed beneath sill along west wall allow localised hvac distribution and control
translucent ramp / steps to entry to allow light passage to basement
bar / cafe integrated into reception
perimeter bulkheads for services distribution / delivery
offices have exposed concrete soffits to maximise volume
uplighting of soffits with flood lights on arms from central beam for services access / diffuse lighting
status
completed